The project includes infrastructure development of 60m & 45m wide roads, construction of various major & minor structures and allied electrical works.
The project will include
- 4 approach roads of 13.28 km having 9 major structures
- 3 iconic steel bridges over Kalundre river & Mumbai-Pune Expressway
- 12 minor bridges
- 27 underpasses
Other approaches to the structure and utility works along with allied electrical works
Stock is currently trading at a PE of 30.8x/23.6x on the earnings of FY25/26E.